Concrete beams deployed, now onto the boring task of stacking more firewood.
The not that big looking pile in the yard turned out to be 3.5 trailer loads.
Yes, poor Iseki still hasn't been washed because frost came back just as I was about to plumb together some kind of pressure washing setup. Soon 25°C though!